TGMDev

Close Data Acquisition Project in Genesis

An active Genesis Project (either configured or loaded from the database) can be closed at any time:
  • Click on the Ribbon Button 'Close Project' in the Ribbon Tab 'OPC Server'
    closeproject
At that point, three different things might happen, according to the current status of the project:
  • The project was just loaded:
    In that case, Genesis 3.1 simply closes the current projet and wait for further actions

  • The project was loaded and modified by adding and/or modifying OPC Group(s) Attributes and/or OPC Item(s) Attributes
    Genesis 3.1 triggers a Message Box to request Project Data Saving

    Request for OPC Project Save


  • The project was loaded and Acquisition is started
    Genesis 3.1 triggers a Message Box to request Data Acquisition Stop

    Request for Data Acquisition Stop